Per the order of MassDOT District 1 Bridge Engineer, the Town has barricaded a portion of the bridge on Mount Washington Road near Farm Lane to remove the live load from Beam One due to advanced deterioration. Removing Beam One from service allows the bridge to remain open with the same load carrying capacity as before. Though the roadway remains two lanes, it is narrower than it was. This bridge is scheduled for replacement as a part of the Mount Washington Road reconstruction project, though no timeline is known. Please proceed over the bridge with extreme caution.